THE CHALLENGES

House Renovation & Extension (One Floor)

Renovation of the ground floor and expansion of floors.

Estimated time of delivery: 10 months
The work was implemented in: 9 months
Delivery Time: 9 months!

CONSTRUCTION DETAILS

  • Renovation and expansion
  • Creation of an extra floor
  • Metallic house with plasterboard
  • Εxternal facade
  • Down floor external facade
  • Changes in plumbing in the inside
  • Placement of ceramic floor
  • Roof completely heat-insulated
Buildia built the first floor from the beginning, as it constructed a heat-insulated roof as well. The ground floor was completely renovated to meet the house residents’ needs, but also to provide them with comfort in the luxurious spaces of the residence.

PROJECT DETAILS

Categories:
Location: Agios Athanasios - Limassol
Architect: Christoforos Stylianides